IPN8710 water anti-corrosion steel pipe this product belongs to "chemical reaction" coating, a two-component packaging, first division for the resin, the initiator, component b as active monomer and catalyst. So before use, two components must be in accordance with the provisions, the important proportion ratio of weighing, mixing together and curing time according to the rules to construction after 30 minutes, after curing the coating should be used up in 6 to 8 hours, lest cement waste. Proportion is as follows: primer, component: component b = 1 barrel: 1 barrel. Please in strict accordance with the requirements ratio (construction) or by the manufacturer when told that the proportion of paint, component: component b = 1 barrel: 1 barrel. Please in strict accordance with the requirements ratio (construction) or by the manufacturer when told that the proportion of 1 coat after coating, the hao after waiting for 24 hours, followed by the second coat. After the paint is used, the drum cover must cover tightly sealed, or are susceptible to the effect of moisture, alcohol, water and metamorphism. Paint film at room temperature after construction dry in 7 to 10 days in room temperature can only be put into use.
Contact us | Sales calls | QQ FAX | |
Address:fruits of DaQiuZhuang Town jing wang JinHai street, west side 200 meters
Contact: manager wang
Tel:15822998178 |
sales one department:022-59598305 sales two department:022-59512993
|
Q Q:2236121215
FAX:022-68574057 |
|
Tianjin yu da xin sheng steel co., LTD | |||
Contact us | |
在線客服 | |
Work Time | |
Mon to Fri :8:30-17:30 Sat to Sun :9:00-17:00 |
|
Contact Details | |
Contact:Manager wang Phone:15822998178 銷(xiāo)售一部:022-59598306 銷(xiāo)售一部:022-59598305 銷(xiāo)售一部:022-68277670 銷(xiāo)售一部:022-68587183 銷(xiāo)售一部:022-59515660 銷(xiāo)售二部:022-59512993 銷(xiāo)售二部:022-59512992 address:Jing wang fruits of DaQiuZhuang Town JinHai street on the west side 200 meters |